MECHANICAL ENGINEER DESIGN, MANUFACTURING, and PROJECTS

CURRICULUM VITAE

 

YAYAN SURYANTO ( Feb. 28th 1963 )  

MECH. DESIGN & MANUFACTURE ENG. & PROJECTS ( exp. 25 years )

 

 +966 57 6677 942

 yayan.suryanto@gmail.com

 

LINKEDLIN:

https://www.linkedin.com/public- profile/settings?trk=d _flagship3_profile_self_view_public_profile

 

CURRENT LOCATION :

Address: AS-SAFA’AH ROAD, AR-RUSYAIFAH, MAKKAH, 21514 , KSA

https://goo.gl/maps/PB7fhDNb3Bq

 

INDONESIA SCHOOL,  MAKKAH. KSA

https://goo.gl/maps/W2QRXfHNfq92

 

 

\                   Project PDCA and Control : ( Mechanical, Electrical, Plumbing, Structure )

         Support implementation : QMS ISO-9001 / EQMS ISO-14001 / OHSAS ISO-18001

 

          R&D :  Develop product, Test Performance, Reliable Improvement, Manufacture.

    

 

A.    MANAGE AND ENGINEERING COMPETENCIES :

 

·       DIDACTIC: APPLIED SCIENCES & VOCATIONAL TRAINER.

·       MEP-installation, HVAC / Chiller, Fire, Test / Commission, Maintenance & Repair.

·       ( PREVENTIVE and REABILITY- MAINTENANCE )

·       HVAC & CHILLER - SYSTEM / PLUMBING WATER & SANITARY / FIRE & SAFETY – BUILDING

·       ELEVATOR & ESCALATOR , AND CONVEYOR MATERIAL MOVEMENT.

·       Fabrication, Machining, Weld-AWS, Autobody Frame, Tank, Piping, QA/QC,

·       Fire Truck Manufacture and Service ( retrofit - refurbish - services ) 

·       MS-Office, Auto-CAD,CAD/CAM , CNC-Machining Lathe Part-program, MS-Project.

  B.    PLANT AND PROCESS-EQUIPMENTS :

 

·       ROTARY EQUIPMENTS :

 

       TURBO PUMP, STEAM TURBINE ,  GAS TURBINES, COMPRESSOR,        

       HEAVY INDUSTRIAL GAS TURBINE FRAME & AERODERIVATED GAS TURBINES

 

·       FIXED EQUIPMENTS :

 

       1. PRESS VESSEL, 2. HEAT EXCHANGER, 3. PIPING , 4. POWER BOILER ( HRSG ),

        5. STORAGE TANK, 6. PROCESS HEATER  7. DEAERATOR,  8. FURNACE & BOILER

 

Ø  POWER & PROCESS PLANT :

 

·       INDUSTRIAL ( LNG, GTL ) PROCESS -- CONSTRUCTION / OPERATION / MAINTENANCE

·       REFRIGERATION COOLING PLANT ( AMONIA ), CRYOGENIC ( NITROGEN ).

·       PLANT INSTALLATION & MAINTENANCE ( BOILER, TURBINE, DIESEL GENSET , WIND-MILL)

·       DESALINATION PLANT (THERMAL : MSF, MED / MEMBRANE : REVERSE OSMOSIS )

·       WASTE WATER TREATMENT  ( INDUSTRIAL and MUNICIPAL WASTE-WATER ).

 

Ø  REFERENCE STANDARDS : 

 

ASME 31-4 ( GAS PIPELINES ), ROTARY API - ( 610, 612, 616, 617 )

SAE / AISI, ASTM, ANSI, NACE, Welding AWS, PWHT Post weld, ASME I,- II, -V,

Vessel BPV-VIII, ASME IX, piping ASME B 31.1-5, B16.5,API 5L, API 5D, API 650

 

Ø  WELDING TECH. AND TEST:

 

SMAW, GMAW, SAW, FCAW, TIG ( AWS standard, implement : WPS-PQR-WPQ

NDT : MAGNETIC PARTICLE, LIQUID PENETRANT, RADIOGHRAPIC, ULTRASONIC, VISUAL

 

Ø  DRILLING RIG AND COILED TUBING:

 

DRILLING RIG, DRAW-WORK, KELLY, ROTARY TABLE, BOP, DRILL-MUD-PROCESSING

DRILL STRING, DRILL-BIT ( TC/PDC ), MWD/LWD, BHA, MUD-MOTOR, DDC-METHOD.

CASING/CEMENTING, DD-CT ( COILED TUBING ).

 

                                                                                                                                  Page 1 of 3

 

C.WORKING EXPERIENCES

 

( VI )  October 2017 – PRESENT

           TRAINER : INDONESIA SCHOOL OF MAKKAH—SAUDI ARABIA.

           SCIENCES and APLIED SCIENCE.

 

( V ). June 2017 – September 2017

 

COMPANY:   LION HORIZON CO. , Riyadh, Saudi

 

CLIENT: SAMSUNG CONSTRUCTION CO. ( FAST – ALLIANCES ) METRO LINE 4 – RIYADH.

 

POSITION: PROJECT MANAGER – SITES FACILITY-DESIGN & MOBILIZATION

SCOPE JOB: ELECTRO-MECHANICAL , PRE-FAB READY TO INSTALL AT SITES.

RAILWAY-STATIONS, DEPOT, AND ITPS, METRO LINE

( IV ). May 2011 – May  2016.

 

COMPANY:   ANEL. KSA, (EM- Contractor), Jeddah, Saudi Arabia.

POSITION: PROJECT  ENGINEER

SCOPE : Inspection, Installation, Equipment, Piping Static and Rotary, Test QA/QC.

A). KING SAUD UNIVERSITY, (CLINICAL SKILL BUILD – PROJECT), Riyadh.

B). HARAMAIN HIGH-SPEED RAIL, (RAILWAY STATION - PROJECT), Makkah.

 

 

( III ). Oct  2006 – Feb  2010.

 

COMPANY:

CONSOLIDATED CONTRACTOR INTERNATIONAL CO.WLL & TEYSEER-JV

Location : Ras Laffan , Industrial City, QATAR GAS

 

1-     Qatar Gas , LNG expansion Project-II ( Train -4 ), Chiyoda-Technip JV

2-     Qatar Petroleum Shell Ltd, Pearl GTL Project ( Phase 1 ) JGC-Kellog Brown Root.

POSITION: Test-Package Engineer / Hydro-testing & PMC

JOB-SCOPE : PROCESS PLANTS

 

# LNG - INLET FACILITIES, LNG -PROCESS & UTILITIES, SULFUR & LNG-BERTH

# GTL - ( GAS TO LIQUID ), Syngas & Fischer-Trop   PROCESS PLANT & UTILITIES.

 

 

( II ). Jan 1996 to Jun 2004

 

COMPANY:

  1. PUNDARIKA ATMA SEMESTA

Fire & Safety Equipment Manufacturer, Service, and Contractor, Jakarta-Indonesia

POSITION : Mechanical Design & Manufacturing Engineer

                                                                                                                                                                                                                                          

JOB SCOPE : RETROFIT BOOSTER COOLING ENGINE and  PROPEL-SHAFT & BALANCING.TRUCK CHASSIS TYPES SELECTION

MECHANICAL DESIGN, MANUFACTURING, INTENSIVE APPLY QMS ISO 9001

 

( I ).  Dec 1990 to Dec 1995

 

COMPANY:

  1. CHUBB LIPS INDONESIA, Manufacturer, Service Contractor, Jakarta-Indonesia

POSITION: Mechanical Design ( PRODUCT DEVELOPER & FABRICATION )

JOB SCOPE: NEW PRODUCT DESIGN, MANUFACTURING , QMS  ISO 9001

RETROFIT BOOSTER COOLING ENGINE and  PROPEL-SHAFT & BALANCING.TRUCK CHASSIS TYPES SELECTION

 

                                                                                                                              Page 2 of 3

 

 

 

 

  1. COURSE / TRAINING:

 

  1. July 1982, Steel melting and Foundry by Cupola Furnace, Machining, Control Tolerance

( PINDAD- Bandung, Army and Civil Product Division ).

 

  1. Oct 1992, Mechanical Engineering Supervisor, Metal Industry Develop Centre, Indonesia.

 

  1. Oct –Nov 1999 (CNC) TURNING AND MILLING and PART PROGRAMMING.

( ATEC – IPTN,  Advance Technology Education Centre - Aircraft Industry ), Indonesia.

 

  1. Sept 2003, Building a Dynamic Team, ( Shamchad Training Management Consultant )

 

  1. Feb 2007, Incident and Injury Free (IIF) Safety Course, Qatar Gas Expand Project (QGX-II)

(JMJ Associates Al Khor Community, Qatar).

 

  1. May 2007, Safety Awareness Course Work Permit System, Chiyoda-Technip (CT-JV)

(Raslaffan, Qatar).

 

  1. October 2008, Safety Awareness Program-Course Pearl GTL Project

( Teyseer-CCIC Camp Simaisma, Qatar ).

                                                                                                                          

 

  1. EDUCATION:

 

 

(3)—1983-1990, FPTK-MESIN, Universitas Pendidikan Indonesia, INDONESIA

        Bachelor Mechanical Engineering

 

(2)—1979-1982, STM-1 Bandung, Bandung INDONESIA

        Technical High School, Mechanical Production / Manufacturing

(1)—1975-1979, STN-1 Kuningan, INDONESIA

        Secondary Technic School, Machanical Basic

        

 

TECHNICAL SCRIPT:

 

DESIGN OF THE TURBO-AXIAL COMPRESSOR MULTI STAGES,

PREFERABLE FOR GAS TURBINES AND JET-ENGINES APPLICATION.

 

BLADE DESIGN OF THE ROTOR AND STATOR REFER TO DATA OF AERODYNAMIC  

PERFORMANCE OF CAMBERED BASIC NACA 0020 AIRFOIL CASCADE.

 

DETERMINE NOMINAL DIMENSION OF ROTOR HUB AND ROTOR BLADES , CONSIDERATION

THE PRINCIPAL FORCES, IDENTIFIED THAT CENTRIFUGAL LOAD ARE THE MOST DOMINANT

LOAD TYPE TENSILE-STRESS ON ROTOR BLADES, EXCEED THE TANGENTIAL LOAD ,

 

THE SET UP TWISTING ANGLES VARIATION OF CHORD-WISE ALONG THE BLADE LENGTH

IS THE REQUIREMENT TO GETS UNIFORMITY OF AXIAL FLUID VELOCITES

OF BOTH FIXED STATOR GUIDE VANES AND ROTOR BLADES.

 

REVIEW THE ADIABATIC COMPRESSION PERFORMANCE ON-DESIGN RPM

AND CHARACTERISTIC OFF-DESIGN RPM.

 

  1. SOME R&D ACTIVITY and COST SAVING MISSION:

 

SOME SUCCESS MISSION :

New Products : Specification , prototype, Test-Improve Reliability,  Production

 

Cost saving & Efficiency: Make Equipment’s for in-house Fabrication.

 

 

                                                                                                                                    Page 3 of 3

 

 

Last Resume Update September 18, 2018
Address MAKKAH, Saudi Arabia
E-mail yayan.suryanto@gmail.com
Phone Number +966576677942

Experience

ANEL.KSA
PROJECT ENGINEER
May 2011 - May 2016

PROJECT SITE AND OFFICE
INSPECTION MATERIAL QA/QC, TEST AND COMMISSIONING
May 2011 – May 2016.

COMPANY: ANEL. KSA, (EM- Contractor), Jeddah, Saudi Arabia.
POSITION: PROJECT ENGINEER
SCOPE : Inspection, Installation, Equipment, Piping Static and Rotary, Test QA/QC.
A). KING SAUD UNIVERSITY, (CLINICAL SKILL BUILD – PROJECT), Riyadh.
B). HARAMAIN HIGH-SPEED RAIL, (RAILWAY STATION - PROJECT), Makkah.

Education

UNIVERSITAS PENDIDIKAN INDONESIA
BACHELOR
Sep 2018 - Aug 1990

MECHANICAL, DESIGN.
DRAWING
MACHINING, WELDING, PRESS FORMING, BENDING
METHOD MANUFACTURING

Contact Candidate