SENIOR QAQC ENGINEER

A result oriented energetic engineer with 5 years of professional  experience working in different  field of civil disciplines  capable of working independently with minimum degree of  assistance

Highly skilled in all facets of site management, planning, quality control & assurance, project management, monitoring, controlling & execution in construction field; expertise in all civil structural & architectural, infrastructure

Handled World Iconic Dubai eye Blue Waters Wharf Island Development Project with MERAAS Holding worth 2 billion AED

Concept-to-execution driver, with the capability to lead by example and effectively collaborate with all levels of professionals across the organization, to produce high-quality results

Proficient in executing operations under contract condition and ensuring quality compliance with stake holders requirements

Expertise in managing the production operations on day-to-day basis, conducting work study and ensuring proper and quality product

Inspired others to challenge business thinking, conventional views and practices; promoted & supported an environment where innovative ideas can be developed & turned into benefits for the business

Expert in organizing Project Execution plan and project quality plan

Sound Knowledge in Project closeout and handing over procedures

Hands on experience in project work sequence

Project progress Tracking and planning skills

Ability to complete project in a stipulated time 

Last Resume Update January 21, 2019
Address dubai, United Arab Emirates
E-mail hambribul@gmail.com
Phone Number 00971554403135

Experience

raasi builders
site engineer
Jan 2019 - May 2014

Monitoring and controlling the construction activities in site and supervises the day to day implementation of the project
Managing manpower at site for timely execution of project and finish the target within stipulated time
Reviewing:
o Shop drawing with IFC
o ASBUILT drawings
o Method statements, specifications
Ensuring:
o Work done as per the shop drawings, specification and work plan and checking of concrete whether it fulfil our required design mix during the Structural work
o Safe work environment, control the use of material and avoid damages and waste, request material, tools and equipment needed for the projects and issue the foreman and contractors
o All architectural interior works as per drawing and specifications.

ALEC ENGINEERING AND CONTRACTING
PROJECT QAQC ENGINEER
Sep 2015 - Current

`
Key Result Areas:
Monitoring and controlling the construction activities in site and supervises the day to day implementation of the project
Managing manpower at site for timely execution of project and finish the target within stipulated time
Reviewing:
o Shop drawing with IFC
o ASBUILT drawings
o Method statements, specifications
Ensuring:
o Work done as per the shop drawings, specification and work plan and checking of concrete whether it fulfil our required design mix during the Structural work
o Safe work environment, control the use of material and avoid damages and waste, request material, tools and equipment needed for the projects and issue the foreman and contractors
o All architectural interior works as per drawing and specifications.
Collaborating with:
o Consultants - WSP, Woods Bagot, LMS, Genius Loci, Inhabit Asia
o Subcontractors
o MERAAS holding, Mirage Leisure & Developments , WSP, WOODS BAGOT , LMS
Strong background in Architecture & Fit out Works and various construction trades
Excellent knowledge in structural and Facade works
Strong negotiation skills with clients , consultants and subcontractors
Handled 1224 Tenant units to clients (MERAAS ) without delay
Following up with stores/purchase,maintaining records and archives to company standards
Ensuring frequent safety inspection & issue site instructions against violations
Conducting weekly site meeting with consultants , architects and clients for better project progress
Tracking project progress and preparing project status report and facilitating handover and project closeout procedure
Good knowledge in Authority Approvals and local body requirements
Aligning project work scope with company structured WBS(Work Breakdown Structure)
Regular updating of materials for submission of material
Knowledge in RFI , CVI , ERI , ASR and ACONEX and ACONEX field for snagging

HERITAGE ARCHITECTS
project engineer
Feb 2015 - Aug 2015

Awareness of the Company Work Values, Quality Policy Statement, HSE Policy Statement, and all project related safety aspects.

Ensure progress of work is achieved through safety standards and quality requirements.

Adhere to site rules and regulations.

Awareness and effective handling of internal and external client complaints.

Ensure effective communication with all stakeholders (internal & external) and follow up on progress deliverables and delays, if any.

Ensure effective communication with the Higher management .

Ensure that all installations at site are carried out as per the latest installation methods and standards.

Ensure through proper supervision that the quality of material and installation of work is in accordance with specifications/requirements.

Advice subordinates on minimizing wastage, and proper handling of tools/equipment in an operational manner.

Ensure awareness and necessary execution towards attaining “Zero‐Snags”.

Raise suggestions, if any, for improving company policies, processes and procedures.

Handle any other duties and responsibilities as designated by the line manager.

Monitoring and Controlling Construction Activities on Site and supervising the day to day implementation of the project.

Attend weekly site meeting- conducted by ARCHITECTS and CLIENTS. Client planning reports submission, ORDER checking, Progress Updating.

Monthly planning with initial planning schedule.

Progress tracking in project, Project Status report preparation and sending

Aligning Project work scope with company structured WBS (Work Breakdown Structure). Coordinating with subcontractors as required

Regular updating of materials for submission of material and conducting reconciliation as per the client’s requirement. Analyzing progress shortfall on a daily, weekly and monthly basis. Attending weekly review meetings updating and modification of the schedule as per project requirements.

flier solutions
site engineer
Jul 2014 - Jan 2015

Awareness of the Company Work Values, Quality Policy Statement, HSE Policy Statement, and all project related safety aspects.

Ensure progress of work is achieved through safety standards and quality requirements.

Adhere to site rules and regulations.

Awareness and effective handling of internal and external client complaints.

Ensure effective communication with all stakeholders (internal & external) and follow up on progress deliverables and delays, if any.

Ensure effective communication with the Higher management .

Ensure that all installations at site are carried out as per the latest installation methods and standards.

Ensure through proper supervision that the quality of material and installation of work is in accordance with specifications/requirements.

Advice subordinates on minimizing wastage, and proper handling of tools/equipment in an operational manner.

Ensure awareness and necessary execution towards attaining “Zero‐Snags”.

Raise suggestions, if any, for improving company policies, processes and procedures.

Handle any other duties and responsibilities as designated by the line manager.

Monitoring and Controlling Construction Activities on Site and supervising the day to day implementation of the project.

Attend weekly site meeting- conducted by ARCHITECTS and CLIENTS. Client planning reports submission, ORDER checking, Progress Updating.

Monthly planning with initial planning schedule.

Progress tracking in project, Project Status report preparation and sending

Aligning Project work scope with company structured WBS (Work Breakdown Structure). Coordinating with subcontractors as required

Regular updating of materials for submission of material and conducting reconciliation as per the client’s requirement. Analyzing progress shortfall on a daily, weekly and monthly basis. Attending weekly review meetings updating and modification of the schedule as per project requirements.

Education

ANNA UNIVERSITY
BACHELORS IN CIVIL ENGINEERING
Oct 2008 - Jul 2012